From the course: Learning Microsoft Project
Unlock the full course today
Join today to access over 24,400 courses taught by industry experts.
Challenge: Work with resource assignments - Microsoft Project Tutorial
From the course: Learning Microsoft Project
Challenge: Work with resource assignments
(bright music) - [Instructor] In this challenge project, I added another resource overallocation for you to eliminate. Task 5, Inspect Equipment, and task 8, Update Power, both use the MRI Bender. Notice that the Inspect Equipment task doesn't have to finish until the following week, when task 14, Install MRI Machine, starts. Add a leveling delay to both resources assigned to inspect equipment to remove the overallocation. Hint, change the table in the Task Form to the Schedule table. In addition, the lead physician commented that you need to assign the city building inspector to task 10, Inspect Renovation. Create the Building Inspector work resource with no standard rate, and then assign that resource to the Inspect Renovation task. In addition, change the task duration to one day. Compare your revised project to the solution in the exercise files that I built.
Practice while you learn with exercise files
Download the files the instructor uses to teach the course. Follow along and learn by watching, listening and practicing.